So I got an emergency call on Saturday, system down, stuck at waiting for CP
I figured the CF was hosed and went to site with a new CF, I knew they were at ver 5.0 so my plan was to convert DB to 6.x , load that to new CF and take care of Licensing first thing Monday A.M. when Mitel opens up.
However, to my surprise, once I arrived onsite, I saw the were still sitting with a CS chassis, that throws my plan out the window,
as if I remember correctly you can't put 6.0 on a CS box.
Luckily, I was able to get the thing to shutdown gracefully and power up successfully, and then backed up everything.
I realize it's a matter of time until disaster strikes again and with that said I'm getting our sales team involved Monday to get them off the dime. But in theory, what were/are my options in that circumstance assuming I couldn't have recovered the CF.
Can I throw ver. 5.0 over top of a 6.0 CF (i.e. Downgrade the CF)
I've never tried or needed to do that, would it trash the CF ?