6
« on: December 17, 2014, 02:50:25 PM »
Hello folks!
I'm tasked with upgrading a 5k to the latest release and while this wouldn't give me a second thought normally, I'm left second guessing procedures in the installation doc because this particular customer has a PS-1 and I've never upgraded one before... According to the install doc, it says to upgrade the base server (chassis 5000 HX) via TFTP, once complete, repeat TFTP upgrade for processing server (PS-1). My worry is that once the base server is upgraded, the PS-1 will lose connectivity because of software mismatch or something and I won't be able to get into it to upgrade it. Am I thinking too much into it? Is it as easy as upgrading base server via TFTP, then upgrade PS-1 via TFTP and the connection between base server and processing server never goes down?